CITY OF MORROW  Application for Heating, Air Conditioning and/or Ventilation Permit
Department of Permits and Licenses
1500 Morrow Road • Morrow Georgia 30260 • (770) 961-4002
Building Permit # __________________ Business License ___________________
Address of Job ________________________________ HVAC Permit   No. M           
Contract With _________________________________ Date _______________
HVAC Contractor _____________________________ Master's Name______________________
Company's Address _____________________________ Master's Signature___________________
City ______________________ State_______ Zip_______ State Card #___________________
Phone # _____________________________________ Class I ( )      Class II ( )
Minimum permit fee - $50 Permit must be obtained before job is started and all items permitted or fees shall be doubled.

RESIDENTIAL (Electric heat to be permitted under KW's)
Fireplace - Prefab - 18.75 No. _______ x 18.75 = _______
Addition of Furnace - 12.50 No. _______ x 12.50 = _______
Air Conditioning, per ton or portion - 5.00 No. Tons _______ x 5.00 = _______
Bath fan, each - 1.25 No. _______ x 1.25 = _______
Vent-a-hood, each - 1.25 No. _______ x 1.25 = _______
Gas line, each - 6.25 No. _______ x 6.25 = _______
Incinerator, each - 6.25 No. _______ x 6.25 = _______
    TOTAL $ ____________

COMMERCIAL
Heating System/Furnace    
     BTU input, per 50,000 BTU or portion -5.00    
Total BTU input No. BTU ______ x 5.00 = _______
Air Conditiong    
     First 20 tons - 5.00 per ton No. ______ x 5.00 = _______
     20.5 tons and over - 1.25 per ton No. ______ x 1.25 = _______
Exhaust fan, per 1000 CFM - 5.00 No. CFM ______ x 5.00 = _______
Grease hoods, per 1000 CFM - 5.00 No. CFM ______ x 5.00 = _______
Bath fans, each - 1.25 No. ______ x 1.25 = _______
Incinerator, each - 18.75 No. ______ x 18.75 = _______
Gas line, per linear foot - .125 No. feet ______ x .125 = _______
    TOTAL $ ____________
SOLAR SYSTEMS    
     Solar Collectors, per panel - 2.50 No. ______ x 2.50 = _______
     Solar tanks, per tank - 12.50 No. ______ x 12.50 = _______

Issued by: __________________________ TOTAL PERMIT FEE $ ___________________
Date _______________